This kind of product itself is also a means of production, and the unit price is generally higher, and the market size is not as large as that of consumer goods.
However, the cycle from requirements gathering to prototype confirmation to market is very short, which requires the entire BOM material to be quickly assembled, and the secondary MRO requires the supplier to cooperate with maximum flexibility.